01. | Works with J.V | 1981 - 1992 | 373.570 |
02. | Basima-Nag Road and Bridge No.1 & 2 | 1999 - 2001 | 56.680 |
03. | Two Bridges on Panjgoor - Gowargo Road | 2000 - 2001 | 24.600 |
04. | Panjgoor - Gowargo Road Km 15+000 to 29+390 | 2000 - 2001 | 68.328 |
05. | KECH Bridge Turbat 700 Rft | 2000 - 2001 | 50.893 |
06. | Boody Kaur Delay Action Dam | 2001 - 2002 | 8.203 |
07. | Dukram Delay Action Dam | 2001 - 2002 | 8.782 |
08. | Black Topping of Road 3 KM Sub Tehsil Mand | 2001 - 2002 | 5.400 |
09. | Rehabilitation of Turbat - Mand Road From KM 0 to KM 14 | 2001 - 2002 | 7.689 |
10. | Construction of Nal - Dat Bridge 495 Rft | 2001 - 2002 | 26.911 |
11. | Construction Approach and Bypass Road of Nal Town and Black Topping of Nal - Dat Bridge | 2002 - 2004 | 123.969 |
12. | Turbat - Mand Zubeda Jalal Road | 2002 - 2004 | 395.820 |
13. | Basima - Nag Road Package XV From KM 10+500 to KM 16+750 | 2002 - 2004 | 32.380 |
14. | Basima - Nag Road Package XVI from KM 14+550 to KM 14+750 | 2002 - 2004 | 29.120 |
15. | Basima - Nag Road Package XVII from KM 16+700 to KM 21+000 | 2002 - 2004 | 29.170 |
16. | Ziarat - sanjavi Road | 2003 - 2004 | 75.496 |
17. | Construction/Black Topping of Road From Manzaki Cross~Sahib Khan Chowkal, Bostan 25 KM | 2005 - 2006 | 25.337 |
18. | Construction of Winder~Kanraj Road upto Dudder (Chinese Camp) 106 KM | 2005 - 2007 | 705.742 |
19. | ADB Assisted Loan No. 2019-Pak BRDSP, (LCB) Khurkhera - Kanraj Road (Rural Roads) | 2006 - 2008 | 320.000 |
20. | Construction of Bridge over Malir River Connecting Shah Faisal Colony and Korangi - 10 | 2006 - 2009 | 1,057.059 |
21. | Construction of 05 Bridges on Karachi - Gharo Thatta Highway (N-5) | 2006 - 2008 | 117.918 |
22. | Construction of 02 Bridges on Sibbi Dhadar Section | 2006 - 2008 | 194.494 |
23. | Diversions on Kararo-Wadh Section of N-65 | 2009 - 2010 | 305.480 |
24. | Periodic Maintenance Functional Over Lay Works Makran Coastal Highway (N-10) | 2010 - 2011 | 90.814 |
25. | Rehabilitation of Bund Khushdil Khan (Contract Package-I) | 2011 - 2012 | 273.74 |
26. | Construction of Six Flood Dispersal Structure Nari River Package-I | 2011 - 2017 | 2,167.768 |
27. | Construction of Six Flood Dispersal Structure Nari River Package-2 | 2011 - 2017 | 1,120.548 |
28. | Construction of Six Flood Dispersal Structure Nari River Package-3 | 2013 - 2017 | 984.110 |
29. | Green Line, Construction of Board Office Interchange Package No. KAR/BRTS/GL/03 | 2016 - 2018 | 1,002.655 |